One of our clients requested assistance in installing an additional steel platform to support a bypass system for the existing conveyor line located here in the North. The client requested that all steel be design and installed within approximately one (1) month. Great planning, design, drafting, structural steel detailing, communication and work from all parties involved which pulled through in order to meet the client’s deadlines. Exactly one (1) month and (13) days later a total of 9,350kg of structural steel was installed in place and ready to be utilized by the client.
-
Call today
705.221.3991
-
Hours of Operation
Mon - Fri 8:00am to 5:00pm
-
Email us now
eric@villeeng.ca